Client
Saudi Binladin Group
Employer
RIVA Engineering GmbH
Architect
DAR Al-Handasah, Beirut/Kairo
Façade Consultant
DAR Al-Handasah Architects, Beirut/Kairo
Installation Time
2011
Scope of Work
- Insgesamt 1.720 St In total 1.720 pc window units
- 590 pc pop-in windows / chicane door (Dobler-HSF)
- 633 pc side-hung vents
- 387 pc tilt vents
- 110 pc fixed panels